Tuesday 31 March 2015

Amber Doors Successfully Refurbish Horizontal Sliding Folding Door for Imperial Commercials



Amber Doors recently carried out a refurbishment project for Imperial Commercials in Derby, helping them to save a considerable amount of money.


We were able to replace the top and bottom tracks for a horizontal sliding folding door, as well as refurbishing the door itself. Before approaching Amber Doors, the customer had been wrongly advised that refurbishment would not be possible and they would require a complete replacement door. This would have cost the customer in excess of £15,000! However, our experienced team quickly advised that the existing door could be repaired and new top and bottom tracks could be installed, allowing the door to function as it should.



At Amber Doors, we understand the importance of causing as little disruption as possible to our customers as any downtime can potentially be extremely costly. In order to allow Imperial Commercials to continue trading throughout the refurbishment project, we were able to carry out the necessary repairs in two phases. 



As 50% of the 10m wide X 6m high folding door was open at all times, we were able to complete all work whilst causing only the absolute minimal amount of disruption to the customer.
In order to install new bottom tracks for the sliding folding door, we first had to remove the existing concrete holding the tracks in place using a breaker. The replacement tracks were then set in new concrete.

At Amber Doors, as well as manufacturing a wide range of industrial doors and loading bay equipment, we can also provide repair, refurbishment and maintenance services, whether on a planned or reactive maintenance basis.

No comments:

Post a Comment